-
Category
-
PostedApr 08, 2024
-
Views32
- Save as PDF
-
- Current rating: 0
- Total votes: 0
- View QR Code
R 3,500.00
Title
Hunting Spotlight with battery the GamePro Marsh
Make
GamePro
Model
Marsh 6500 Lumes
Condition
Like New
Description
GAMEPRO MARSH RECHARGEABLE LED SPOTLIGHT
Retails for R5000.00
Up to 6500 lumens of illumination power with an impressive 1500m maximum distance. This spotlight is also rechargeable with a fast 3 hour charging time.
• 65W LED
• Up to 6500 lumens
• Beam distance: 1500m
• 3 modes: high, medium, and low
• Run-time: High -1hr, Medium -1.5hr and Low -2.5hr
• Included cigarette connector with long lead for continuous light.
• Fitted with detachable, interchangeable 12.6V 2600mAh lithium battery
• Fast 3 hr charging
• Reverse polarity protection
• Weight: 760g
• Dimensions: 228x117x240mm
• Water resistance: IP65
Retails for R5000.00
Up to 6500 lumens of illumination power with an impressive 1500m maximum distance. This spotlight is also rechargeable with a fast 3 hour charging time.
• 65W LED
• Up to 6500 lumens
• Beam distance: 1500m
• 3 modes: high, medium, and low
• Run-time: High -1hr, Medium -1.5hr and Low -2.5hr
• Included cigarette connector with long lead for continuous light.
• Fitted with detachable, interchangeable 12.6V 2600mAh lithium battery
• Fast 3 hr charging
• Reverse polarity protection
• Weight: 760g
• Dimensions: 228x117x240mm
• Water resistance: IP65
Phone
Address
Riesling Street
Country
South Africa
State/Region/Province
Province of the Western Cape
City
Paarl
Reference Number
GUA299253